Our primary service
Luxury Bathroom Remodeling
The bathroom is the room where shortcuts show up last and cost the most. This is the work we build the business around.
What the job includes
Demolition and substrate
Existing surfaces removed to solid structure, framing checked, floor flattened and prepared before anything is set.
Waterproofing
Bonded membrane over a properly sloped base, corners and penetrations detailed, then flood tested before tile.
Tile and stone
Marble, natural stone or large-format porcelain, laid out so cuts land where they are least visible.
Glass and fixtures
Frameless enclosures set to plumb openings, fixtures aligned to the tile layout rather than fought afterward.
Finish detail
Grout, sealant and transitions — the millimeter-level work that separates a luxury bath from an ordinary one.
How the work runs
Walkthrough and measurement
On-site visit, measurements taken, existing conditions and problem areas identified before any number is quoted.
Layout decided on paper
Tile layout, cut lines and pattern direction agreed before material is ordered — this is what avoids awkward slivers at the door.
Installation
One continuous run of work by the same installer, not a schedule of subcontractors passing the job along.
Final inspection
Every line, corner and transition checked before handover.
What a Luxury Bathroom Remodel Actually Involves
A luxury bathroom is not a standard bathroom with expensive tile in it. The difference is in the layers nobody sees: the slope built into the base before waterproofing goes down, the flatness of the substrate before a large panel is set, and the movement joints that keep stone from tenting when the slab shifts. Get those wrong and the finish fails no matter what the material cost.
Every project here is installed by the same craftsman from demolition to the final grout line. There is no rotating crew, no handoff between a demolition team and a tile team and a glass team. The person who walks the space and quotes the job is the person who sets the tile. For a homeowner, the practical effect is that nothing gets lost between trades — the layout decided on day one is the layout that gets installed.
That also sets the pace. Working alone means taking fewer projects and finishing them properly, rather than running four half-done bathrooms at once. It is the reason the schedule runs continuously instead of stopping for a week between trades.
Waterproofing: Where Showers Actually Fail
A shower does not fail at the tile. It fails behind it. Water passes through grout — that is normal and expected — and the waterproofing layer underneath is what stops it from reaching framing and subfloor. When that layer is wrong, the tile can look perfect for two years and then the drywall outside the shower starts staining.
The detail most failed showers are missing is the pre-slope. The slope has to be built into the base under the membrane, not only on top of it. Without it, water that reaches the membrane sits there instead of draining, and the assembly stays wet permanently.
On every shower we build: bonded membrane continuous across the pan, up the walls, and detailed into every corner and pipe penetration. Niches and curbs get wrapped rather than merely tiled over — they are the two places leaks start most often. The assembly is checked for water holding before the first piece of tile goes on, because correcting it afterward means demolishing a finished shower.
More detail on the shower systems we build, including curbless entries and frameless enclosures, is on the showers and waterproofing page.
Material: What Drives the Cost, and What Drives the Result
In South Florida, luxury bathroom projects are commonly quoted in the tens of thousands, and the material is only part of it. What separates a five-figure bathroom from a six-figure one is usually the stone and the layout complexity, not the fixtures.
Marble and natural stone is the least forgiving material we install. Slabs and tiles are dry-laid and sequenced before anything is set, so the veining runs continuously across walls and corners rather than stopping at every seam. White thinset goes under white and light stone — grey setting material shadows through translucent marble and cannot be undone once it cures.
Large-format porcelain looks effortless and is the least forgiving tile to install. Tolerances tighten as the panel grows: a floor that is acceptable for 12-inch tile will produce visible lippage with a 48-inch panel. Floors are measured and flattened before installation, because thinset is a bonding material, not a leveling compound. Leveling systems and back-buttering keep every edge flush with its neighbor, and coverage is verified as the work goes — voids under a large panel become cracks under load.
When the same stone continues from the bathroom into the kitchen, the backsplash is set with the veining carried across from the countertop.
How the Project Runs
Walkthrough and measurement. On-site visit before any number is quoted. Existing conditions matter more than square footage: slab condition, framing, where the drain sits, whether the opening for a frameless enclosure is plumb. A quote given over the phone from a photo is a guess.
Layout decided on paper. Tile layout, cut lines and pattern direction are agreed before material is ordered. This is the step that avoids awkward slivers at the door and cuts landing in the middle of a focal wall. It costs nothing and it is where most of the visible quality is decided.
Installation. One continuous run of work by the same installer. Demolition to solid structure, framing checked, floor flattened, waterproofing installed and tested, then tile, then glass and fixtures aligned to the tile layout rather than fought afterward.
Final inspection. Every line, corner and transition checked before handover, with grout and sealant finished and the stone sealed.
Where We Work
Quality Tile serves Coconut Creek, Margate, Coral Springs, Parkland, Pompano Beach, Deerfield Beach and Boca Raton. Owner-operated, with twenty years in construction and the last eight in South Florida, and the whole project discussed in English, Spanish or Portuguese — whichever language you are most comfortable making decisions in.
Finished work across these cities is on the project gallery, and common questions about timelines, waterproofing and materials are answered on the FAQ.
Planning a bathroom or tile project?
Serving Coconut Creek, Margate, Coral Springs and nearby Broward County. English, Spanish and Portuguese.